Project Pictures

These are some images of our project, such as pictures taken during our field work, flood maps with the location of critical facilities and pictures of the created of flood scenarios.

   Field work: Taking pictures and recording measures of wall heights in Chelsea High School.

Screen Shot 2015-10-12 at 4.19.05 PM

Map of  Chelsea with the one in one thousand year flood event inundation depths for the year 2070.

Screen Shot 2015-10-12 at 4.15.21 PM

Flood inundation scenario created with scaled pictures and flood heights from inundation maps.

2in1