Water Supply

Water is needed on formal initiation sites for both showers and irrigation purposes.  Currently there is no water supply on the Good Hope College Initiation Site.  Water will be supplied from a 500mm bulk water supply that runs parallel to Mew Way Road on the eastern border of the proposed site. A T break will be installed to the mainline as shown in the diagram below, which reduces the mainline water flow from 500mm to 100mm before the water travels into a 50mm pipeline.

Steel T-Connection

Steel T-Connection

A water meter must also be installed inside the site perimeter by the Department of Water and Sanitation.  The water meter will be enclosed in a safe box placed at ground level, with a locking cover to prevent vandalism.  A design for the water meter can be viewed in COCT Appendix F.